Keep your facility running.
Get maintenance off your plate.
Your in-house crew has a full schedule. The building still needs attention. Stallworth Contracting helps plant engineers and facility managers handle commercial building repairs, recurring maintenance and capital improvements—with work planned around production and documentation you can act on.
Start with your three highest-priority issues. Call 478-785-1234 • Mon–Fri, 9–5 Eastern.
Your maintenance list shouldn’t run your day.
A recurring leak. Damaged concrete. Steel that needs repair. Equipment that has to move while production keeps going. Each issue becomes another call, another workaround and another item waiting for someone to own it.
Bring Stallworth the list, the deadlines and the operating constraints. We help you define priorities and coordinate a practical scope, so your team can spend less time chasing repairs and more time running the facility.
When a project has been difficult to place, tell us why. We welcome the conversation about what makes it challenging.
Support across your building and site.
From a roof leak to a production-line change, start with the outcome your facility needs. Explore the work we can help you plan and coordinate.
Bring related repairs into one coordinated plan.
Welding & steel repairs
Mobile welding, field fabrication, steel repairs, guards, cages and protective barriers—planned around access and the work taking place nearby.
Explore welding & fabrication →Concrete & site improvements
Parking lots, flatwork, slabs, foundations, equipment pads and concrete repairs. Bring use, loading, access and project timing into the scope.
Explore commercial concrete →Equipment & line relocation
Specialty manufacturing equipment and production-line moves, with planning around layout, work sequence, operating constraints and available shutdown windows.
Explore equipment relocation →Building & facility repairs
Building-envelope repairs covering roofs, walls and doors; framing, office buildouts and warehouse improvements. Bring the work your in-house crew cannot absorb into one coordinated repair list.
Discuss My Repair ListPerimeter security & access
Perimeter fence solutions, automatic gates and access control for industrial and commercial facilities. Coordinate repairs and improvements around deliveries, employee access and site operations.
Explore fencing & gates →Civil work & utility relocations
Utility relocations, underground and directional boring, heavy civil work, tractor work, brick, block and masonry. Define the site conditions, construction scope and operating constraints before work begins.
Discuss Site & Utility Work →Your crew keeps the plant moving. We handle the construction backlog.
When your plant engineer has work the in-house crew cannot take on, there should be a clear next call. Stallworth supports corrective repairs, recurring inspections and planned improvements across the building envelope and site.
Our three-year Unilever maintenance contract included weekly campus inspections and two technicians onsite within two hours of a callout. The campus had more than three million square feet under roof and thousands of roof penetrations to monitor and maintain.
That response commitment applied to the Unilever contract. Inspection frequency, staffing and response terms are defined for each facility agreement.
A maintenance agreement built around your operation.
- Define covered assets, inspection routes, visit frequency and escalation priorities.
- Agree on labor and material rates in the contract schedule of values.
- Use a retainer plus documented service tickets where that model fits the scope.
- Track receipts, completed repairs, open items and recommended follow-up work.
- Scope capital improvements separately around production requirements.
Clear records for every maintenance decision.
A repair visit should leave your team with useful information. Our reporting approach connects field work to the remaining maintenance backlog and future capital needs.
See the work.
Before, during and after photos document conditions and repairs. Site maps identify the work areas so your team can locate and follow up on the issue.
Track open items.
When a complete solution needs another visit, identify the remaining work, parts that need ordering and the recommended next steps.
Plan ahead.
Record additional concerns discovered during inspections or repairs—including items outside the current work order—so your plant engineer can prioritize follow-up.
Show us the problem. Let’s organize the work.
Share the priorities.
Send the facility address, your top issues and available photos. Tell us what the problem affects and when the work matters.
Define the right scope.
Discuss assessment needs, access, related trades and operating constraints. Establish the work, responsibilities and sequence.
Coordinate the project.
Agree on the schedule and work arrangements. Keep the project focused on the outcome your facility needs.
Major work. Manufacturing kept moving.
Unilever
180,000 sq. ft.12 days.
During a three-year campus maintenance relationship, Stallworth completed multiple cold-storage roof replacements and major capital projects. One emergency winter roofing project involved 180,000 square feet and 840 penetrations.
Three shifts worked around the clock to complete that project in 12 days while maintaining manufacturing continuity and a perfect project safety record.
Country Home Bakers
Complete replacement.24 hours.
An 8,400-square-foot roof with 290 penetrations required complete replacement and structural repairs. Stallworth completed the scope within a 24-hour window while maintaining continuity of operations.
Continental Tire
12,000–74,000sq. ft. roof projects.
Stallworth completed low-slope roof replacements, utility infrastructure installation, and custom fabrication and installation of awnings on kiln towers—all while maintaining continuity of operations.
What would help your facility most?
A repair needs attention.
Describe the damage, location and effect on the operation. We’ll discuss the next step and current availability.
Send My Repair RequestThe maintenance list needs a plan.
Bring recurring issues, deferred repairs and work windows together for a maintenance-priority discussion.
Review My Maintenance PrioritiesThe facility needs to change.
Discuss growth, equipment relocation, facility conditions and the information needed for capital decisions.
Discuss My Facility Improvement PlanPlanning a larger investment? Explore our facility reports and capital improvement planning for condition assessments, repair priorities and facility-growth decisions.
Facility maintenance questions
What does an industrial facility maintenance agreement cover?
We define the covered buildings, assets, inspection schedule, response arrangements, labor and material rates, and documentation before work begins. Construction and building maintenance can include roofs, walls, doors, concrete, masonry, fencing, gates, access control and site improvements. Capital projects are scoped separately.
Do you provide photos and follow-up recommendations?
Yes. Reporting includes before, during and after photos, site maps, unfinished items, parts needing to be ordered, and ongoing maintenance concerns identified during the visit. This gives your plant engineer a record of completed work and the information needed to prioritize what remains.
Can you help with one repair or a continuing maintenance list?
Yes. Start with the immediate issue or the list your team is tracking. We can discuss individual repairs and scheduled support, with covered tasks, frequency and responsibilities defined for your facility.
Can several kinds of work be coordinated together?
Bring the full list into the discussion. We review which items fit the project, how they relate and which resources or specialist trades are needed. Our employees and established subcontractor network support the work we undertake.
Can work be planned around production?
Tell us the production schedule, access limits and available work windows. Those requirements guide the scope and sequence. Our Unilever project is one example of work completed with production continuing.
Where do you provide facility services?
We serve commercial, industrial, institutional and municipal facilities in Macon and Middle Georgia, considering projects across approximately 120 miles according to scope and location.
What should we send first?
The facility address, a contact number, your three highest-priority issues and available photos. Include deadlines and operating constraints. You do not need a finished specification to start the conversation.
You run the facility.
Let’s get the work moving.
Tell us what needs fixing, what it affects and what your operation needs to keep doing. We’ll help turn the list into a practical next step.
Stallworth Contracting LLC • Macon & Middle Georgia • Office: Monday–Friday, 9–5 Eastern
Selected customer experience
Commercial, industrial, institutional and public-sector projects.
Public-sector project experience
- U.S. Department of Defense
- United States Air Force
- Georgia National Guard
- State of Georgia
- Department of Homeland Security
- ATF
- City of Macon
- Monroe County
- Peach County
- Peach County Fire Department
- Fort Valley Police Department